63. Infrared Thermography studies at Alumina Plant (NALCO) [2009-10]
64. Estimation of scaling heights in Alumina Plant Precipitators (NALCO) [2009-10]
65. Pilot scale development of process technology for manufacturing of constructional blocks / bricks and artificial ceramic stone chips utilising red mud (NALCO & MRCPL) [2009-10]
66. Study of heat treatment process for destruction of toxic cyanide present in Spent Pot Lining (SPL) of NALCO on lab. scale. (NALCO) [2009-10]
67. Extraction of alumina from PLK (NALCO) [2009-10]
68. Infrared Thermography studies at Alumina Plant (NALCO) [2011-12]
69. Indigenization and development of wrought Aluminium Alloys for Indian Defence. (DRDO/ DMRL, Hyderabad) [2011-12]
70. Assessment of billet quality for DC cast AA6063 alloys (NALCO) [2011-12]
71. Double digestion studies of Vedanta bauxite (VEDANTA) [ 2012-13]
72. Detail study in Melt loss generation and derive solutions for reduction in Melt loss. NALCO) [2012-13]
73. Beneficiation of low grade bauxite / laterite of Kutch & Sarushtra deposit, Gujarat, (GMDC Ahmedabad) [2012-13].
74. PFC measurements in aluminium electrolysis cells on lab. Scale NALCO, Angul [2012-13].
75. Pre-feasibility detailed studies for setting up of 18,000 MT / Annum of special alumina plant at Cuddalore (Tamil Nadu) Aria Chemicals Private Limited [2012-13].
76. Bench Scale Studies for Treatment and Utilization of Carbon Portion of Aluminium Spent Pot-Liner (SPL): Recovery of Carbon, Sodium and Fluorine Values (NALCO) [2013-14]
77. Caustic soda consumption audit for NALCO alumina refinery, (NALCO, Damanjodi) [ 2013-14]
78. Characterization and technological testing of Gujarat bauxite for (NALCO Gujarat Plant) [ 2013-14]
79. Analysis of impurities (Fe, Si, Ca etc.) in alumina and aluminate liquor using hand held spectrometer , (NALCO) [ 2013-14]
80. Study on scale formation in precipitation tank based on the operating parameters to optimize the uptime of tanks at Alumina Refinery plant, (NALCO, Damanjodi) [ 2013-14]
81. Infrared thermography studies for 132 KV towers from Jaynagar to Damanjodi, (NALCO, Damanjodi) [ 2013-14]
82. Infrared thermography studies at alumina plant 2014 (NALCO, Damanjodi) [ 2013-14]
83. Development of Ceramic Proppant form PLK and Fly Ash at Laboratory Scale , NALCO [ 2014-15 ]
84. Development of a suitable process for conversion of waste aluminium dross into value added product SESA STERLITE, Jharsuguda, Odisha [ 2014-15 ]
85. Development of a process for detoxification of SPL 1st cut for recovery of mineral values (Carbon, Soda etc) SESA STERLITE, Jharsuguda, Odisha [ 2014-15 ]
86. Evaluation of grain refining efficiency of TiBAL, MINEX Metallurgical Co. Ltd. Nagpur [ 2014-15 ]
87. Setting up of Mini-pilot plant for red mud based light weight foamed bricks at NALCO (NRTC), Bhunbaneswar [2014-15]
88. Reduction of melt loss in foundry & cast houses BALCO, Korba [ 2015-16 ]
89. Characterization and Technological Testing of Kutrumali and Sijimali bauxite in Odisha, Larsen & Toubro Ltd. Mumbai [ 2015-16 ]
90. Beneficiation of low grade bauxite at Kawardha & Manipat Mines [2016-17] BALCO, Korba
91. Optimisation of parameter for ultrasound precipitation of alumina liquor with emphasis on production of special fine hydrate and increasing liquor productivity [2015-16] 12mts
92. Mechanical activation of bauxite followed by technological studies[2016-17] 24mts NALCO
93. Studies on trace impurities, it’s behavior & control in Bayer’s process with respect to reduction in product hydrate [2016-17] 24mts NALCO
94. P-55 Utilization and development of process for recovery of strategic rare earths from industrial waste –Bauxite Residue at lab scale, Ministry of Science and Technology (DST) [2016-17] (36 mts)
95. P-56 : Characterization study and technical assessment of raw materials & related products. Hi-Tech Metafluxes, Raipur [2017-18] (4 mts)
96. P-57 : Supply of Equipment for online bath measurement. HINDALCO, Hirakud[2018-19] (3 mts)
97. P-58 : Technological characterization of Bauxite sample for establishing the mass balance of the process design of the expansion study at Vedanta Ltd, Lanjigarh, Kalahandi, Odisha.VEDANTA
98. (P-59)Technical feasibility study for extraction of alumina as Al F3 from low grade bauxite (IBAAS, Nagpur)
99. (P-60) Development of a process technology (at lab scale) for low costproduction of 3N (99.9%) pure alumina (Ministry of Science and Technology -DST)
100. N-42 “Utilization of PLK (Partially Lateritised Khondalite) as a potential and value added filler material with specific reference to white ceramics and pigments” NALCO, Bhubaneswar (Joint project with CV Raman College of Engineering, Bhubaneswar) [2016-17] 33 mts
101. N-43 Development of inline automated anode butt monitoring system to measure anode butt parameters ( NALCO, Bhubaneswar )
102. N-44 Development of Wi-Fi enabled sensor arrangement for online measurement of anode current distribution of aluminium electrolysis cell ( NALCO, Bhubaneswar )
103. N-45 Development of ceramic proppant from low grade materials (Partially LateritisedKhondalite -PLK, Fly ash, etc.) - Phase-II-Scale up studies ( NALCO, Bhubaneswar )
104. N-46 :An innovative and viable process for recovery of iron values from red mud and processing of non-iron material for developing value added products – Complete Utilisation of red mud”. NALCO
105. N-47 : Development of a process for preparation of 4N High Pure Alumina (HPA) and substrate making for its validation in LED/semiconductor, NALCO, Bhubaneshwar [ 2020-21]
106. P-61 : Instrument for Realtime measurement of anode current distribution of aluminium electrolysis cell
Dept of Science & Technology, DST, New Delhi[ 2020-21]
107. P-62 : TPN:59031 Instrument for Instantaneous and onsite measurement of aluminium electrolysis bath parameters : DST, New Delhi [ 2020-21]
108. N-48 : Development of DC cast Al Alloy for Yoke in automobile applications, NALCO Bhubaneshwar
(Jointly with ARAI Pune)
109. N-49 : Demonstration cum heat treatment, leaching-recycling and liming study of JNARDDC-NALCO process ( by utilizing 50-60 kg batch of 1st cut SPL)
110. P-64 : Development and Supply of an Instrument for Instantaneous Onsite Measurement of Bath Parameters BALCO, Korba
111. P-65 : Recycling Coal Mine Overburden to Reuse as a Value-Added Building Material to Promote a Circular Economy, by Central Mine Planning and Design Institute (CMP&DI), under S&T Plan of Ministry of Coal, Gov. of India (with Civil Eng. Dept, VNIT, Nagpur, Dept. of Architecture & Planning, BIT Mesra and Civil Eng. Division, CMPDIL, Dhanbad )
112. N-50 : Kinetic study of different unit operations like digestion, desiliction. NALCO, Bhubaneshwar
113. N-51 : Detailed Thermal / Heat Balance study of the cast house furnaces to increase furnace efficiency
114. P-67 : Coal mine overburden alkali-activated composites (CMOAAC) for pre-fabricated 3D volumetric construction elements & system thereof (3DVCES); MT-182: Ministry of Coal
115. P-68 : Evaluation of CGM (Crystal growth modifier) Kiberlite Chemicals Pvt Ltd. Bangalore
116. P-69 : Performance evaluation of Dewatering aid (DEWA-369) chemicals Abhitech Energycon Ltd. Mumbai
117. P-71 : Compositional analysis of heavy/trace metals in mother’s breast milk - A biological monitoring study. Lata Medical Research Foundation, LMRF Nagpur